15 Most Common Construction Estimating Mistakes

Accurate construction estimating is crucial for the success of any construction project. Mistakes in construction estimates can lead to budget overruns, project delays, and client dissatisfaction. By understanding and avoiding common estimating mistakes, you can ensure that your projects stay on track and within budget.



1. Failure to Visit the Site

Not conducting an on-site inspection before estimating is a significant oversight. It means relying solely on plans and specifications, which may not capture all the nuances of the site conditions.

Impact

 Missing crucial details such as access issues, soil conditions, and existing structures can lead to inaccurate estimates. These oversights can result in significant additional costs and delays once the project begins.

Solution

Always visit the site to gather accurate information. A thorough site inspection allows you to identify potential challenges early and incorporate them into your estimate.



2. Misapplying Risk and Contingency

Incorrectly assessing risk factors and not allocating adequate contingency budgets can lead to severe financial strain. Many estimators either overlook potential risks or underestimate their impact.

Impact

Without a proper risk assessment, unexpected issues can cause budget overruns and project delays. Insufficient contingency funds mean there’s no buffer to cover unforeseen expenses.

Solution 

Conduct a detailed risk assessment for every project. Identify potential risks and allocate a contingency buffer of 5-10% of the total project cost to cover unexpected expenses.
Conduct a detailed risk assessment for every project. Identify potential risks and allocate a contingency buffer of 5-10% of the total project cost to cover unexpected expenses.



3. Not Reviewing Subcontractor Estimates

Subcontractors provide estimates for their portion of the work, but these estimates can sometimes be inaccurate or incomplete. Not thoroughly reviewing these estimates is a common mistake.

Impact

Inaccurate subcontractor estimates can skew the overall project estimate, leading to budget issues and potential disputes with subcontractors.

Solution

 Carefully review and verify all subcontractor estimates. Ensure they are detailed and align with your project scope and requirements. Seek clarifications where necessary to avoid surprises later.



4. Overlooking Costs During Estimation

Small costs can add up over the duration of a project. Overlooking these during estimation can lead to significant budget discrepancies.

Impact

Missing out on smaller costs, such as permits, inspection fees, or minor material expenses, can result in underestimating the total project cost. These overlooked expenses accumulate, causing budget overruns.

Solution 

Ensure every cost, no matter how small, is accounted for in the estimate. Create a comprehensive checklist to cover all possible expenses and review it thoroughly.



5. Underestimating Overheads

Overheads are the indirect costs associated with running a construction project, such as administrative expenses, utilities, and insurance. Underestimating these costs can strain your budget.

Impact

If overhead costs are not fully accounted for, you may face financial strain during the project. This can affect cash flow and potentially delay project progress.

Solution

 Include all indirect costs in your estimate. Review past projects to understand typical overhead expenses and adjust your estimates accordingly.



6. Not Properly Assessing Risk

Ignoring potential project risks and their financial impact is a critical mistake. Every construction project carries risks that need to be evaluated and planned for.

Impact

Without a proper risk assessment, you may face unexpected challenges that disrupt the project timeline and budget. This can lead to significant financial losses.

Solution

Conduct a thorough risk assessment for each project. Identify potential risks and develop mitigation strategies. Regularly review and update the risk assessment as the project progresses.



7. Confusing Estimates and Targets

Mixing up budget estimates with target costs set by clients can lead to misalignment between project expectations and financial realities.

Impact

When estimates and targets are confused, there’s a risk of either over-promising or under-delivering. This can cause disputes with clients and damage your reputation.

Solution

Clearly differentiate between estimates and targets. Communicate effectively with clients to set realistic expectations and ensure alignment between project goals and budget.



8. Inaccurate Material Quantities

Miscalculating the amount of materials needed for the project can lead to either over-ordering or running out of materials mid-project.

Impact 

Over-ordering materials results in wasted resources and increased costs, while under-ordering can cause project delays and additional expenses to rush orders.

Solution 

Use precise measurement tools and double-check takeoffs. Ensure all material quantities are accurately calculated and verified.



9. Job Site Surprises

Unexpected issues arising on the job site that were not anticipated during estimation can derail a project.

Impact

These surprises can cause project delays and additional costs, impacting the overall project timeline and budget.

Solution 

Conduct thorough site inspections and plan for contingencies. Include a buffer in your estimate to cover unexpected site issues.



10. Not Checking Your Numbers

Failing to verify calculations and figures in the estimate can lead to mathematical errors and inaccuracies.

Impact

Mathematical errors in estimates can result in significant budget discrepancies and financial losses.

Solution

Double-check all numbers and use software tools to minimize errors. Implement a review process to ensure accuracy before finalizing the estimate.



11. Poor Interactions with Dealers

Not maintaining good relationships with material suppliers and dealers can result in higher costs and potential delays.

Impact

Poor supplier relationships can lead to less favorable terms, higher prices, and delays in material delivery, affecting project timelines and budgets.

Solution 

Build and maintain strong relationships with suppliers for better deals and service. Regularly communicate and negotiate favorable terms to ensure reliable supply chains.



12. Taking Shortcuts

Cutting corners in the estimation process to save time can lead to incomplete or inaccurate estimates.

Impact

 Incomplete or inaccurate estimates result in project issues, including budget overruns and delays.

Solution

Follow a thorough and detailed estimation process without shortcuts. Ensure all aspects of the project are covered in the estimate.



13. Unclear or Incomplete Specifications and Plans

Working with vague or incomplete project plans can lead to misunderstandings and inaccurate estimates.

Impact

Inaccurate estimates due to unclear specifications can cause project disputes and budget overruns.

Solution

Ensure all project plans and specifications are detailed and clear. Confirm all details with stakeholders before finalizing the estimate.



14. Underestimating Project Scope

Not fully understanding or accounting for the entire project scope can result in incomplete estimates and potential project overruns.

Impact

Underestimating the project scope can lead to budget and timeline issues, as additional work may be required beyond the initial estimate.

Solution

Conduct a comprehensive scope analysis and confirm details with all stakeholders. Include all aspects of the project in the estimate.



15. Unprofessional Bidding

Submitting bids that lack professionalism or accuracy can lead to losing bids or facing challenges if awarded.

Impact

Unprofessional bids can damage your reputation and result in lost opportunities or project difficulties.

Solution

 Prepare detailed, accurate, and professional bids. Ensure your bids reflect your expertise and attention to detail.



Eliminate Risk By Choosing A World Class Estimating Service

Avoiding these common estimating mistakes is crucial for successful construction projects. Accurate estimates lead to better project outcomes, including staying on budget and on schedule.By choosing a service like Master Estimators, you can eliminate your risk! From concrete to drywall to HVAC to flooring and plumbing, we offer a wide range of solutions.Our expertise can help you avoid common pitfalls and achieve project success. Book a free consultation today!

Michael P.
Construction Estimator at Master Estimators Ltd. | Website | + Posts

Michael P. is a seasoned construction estimating expert with over two decades of experience in the industry. As the voice behind Master Estimators Ltd., he shares insightful tips and strategies on material takeoff and project bidding. His blogs aim to equip construction professionals with the knowledge to enhance accuracy and efficiency in their estimates.

Share:

More Posts

Rebar-Calculator

Rebar Calculator

Use our rebar calculator to estimate the amount of material required for a project that involves concrete. (You can always reach out to us for your

Drywall Calculator

Use this drywall calculator to estimate the amount of drywall you will need for your project. Drywall Calculator Height ftinydcmm Width ftinydcmm Calculate Result: 0

Plywood-Calculator

Plywood Calculator

Use this plywood calculator to estimate the amount of plywood you will need for your project. Plywood Calculator Length ftinydcmm Width ftinydcmm Thickness ftinydcmm Boards

Board-Foot-Calculator

Board Foot Calculator

Board Feet Calculator Length inft Width inft Thickness inft Boards Calculate Result: 0 Board Feet What is a Board Foot? A board foot is a

Talk To An Expert!